EPA Victoria has given approval to AquaSure to proceed with construction of the marine outlet and diffuser structures for the Victorian Desalination Project. As part of EPA’s assessment AquaSure was required to submit final plans and specifications, results of a biological survey, hydrodynamic modelling and a toxicity assessment supporting the final location of the marine outlet and design of the diffuser structures. These documents, including technical reports and drawings, can be viewed below.